After a period of of uncertainty the decision was made to build a brand new railway in the 1980s [2]. This new railway uses diesel hydraulic locomotives and push-pull rakes of coaches. The new railway was built to 914mm narrow gauge (the original was 1, 067mm) with a simplified track layout compared to the original. It opened in 1986.
Information | |
---|---|
Number built: | 2 |
Built: | 1986 |
Builder: | Severn Lamb |
Motor: | Deutz diesel |
Power: | 55 hp (41 kW) |
Wheel arrangement: | 4wDH |
The current Southend Pier Railway, which is owned and operated by the local council, has two trains, each consists of a locomotive (which is at the pier end of the train) and six passenger cars. The last and shore end trailer has a driving cab. The two trains have been named Sir William Heygate and Sir John Betjeman.
The line is mostly single with a passing loop at the mid-point, both pier head and shore stations have two platforms so in peak times both trains can be in operation, a single battery electric car is also used in the Winter. Up to one hundred and eighty two passengers can be carried per train [3]. The locomotives can also on occasion propel a flat wagon in order to take provisions up to the pier head.
There are plans to replace the locomotives, which are becoming life expired and hard to maintain, with new trains (of as as-yet unspecified type) in the next couple of years [4].
Sir William Heygate at the pier head station |
The locomotives also have space for push-chairs and other small cargo |
Sir John Betjeman heads back to shore |
Aboard one of the cars |
Sir John Betjeman at the pier station |
The driving railer of Sir John Betjeman at the shore station |
[1] Keith Turner, Pier Railways & Tramways of the British Isles (Oakwood Press, 1999) p. 49
[2] Colin J. Marsden (ed.), Light Rail (Key Publishing, 2018) p. 94
[3] Turner p. 61
[4] £3.25m set aside to replace Southend Pier's outdated trains https://www.southendstandard.co.uk/news/17348641.325m-set-aside-to-replace-southend-piers-outdated-trains/